Tuesday, August 26, 2008

The newly finished bathroom


After
Originally uploaded by J Semenza
Okay, things get out of hand. First came the yoga room, and while talking about paint Nick suggested that maybe we could get the bathroom painted at the same time. Great Idea I said. We had some high gloss white paint (originally only going to be used for trim) and he wanted it white. So we started, or rather, he started. I was working on the yoga room.

First came the cleaning of the walls and the taping off of things and we started talking some more, about maybe getting something done to the floor. Then he primed the walls and ceiling. We started talking about fixing the sink and toilet. Then he painted and painted... As the room started to look better the plans grew. In the end, he fixed the toilet. He leveled the floor and put down a gorgeous faux tile linoleum. He stripped the old metal shower of years of latex and oil paint, rust, and contact paper then coated it with something more suitable. The parts for the sink are on order, a new shower curtain is up and we found the bright green curtains at a garage sale for a dollar.

The room looks so much larger and brighter. This is a basement bathroom and we finally feel like we can use it. Or in Nick's words: not be ashamed if anyone sees it.

For photos of both before and after see:
http://www.flickr.com/photos/jsemenza/sets/72157606958859859/

Whooo HOOO
Jenny

No comments: